Danfoss FC 100 Series Operations Instructions Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 66
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
4.1.3 Network Termination
Dependent on the type of topology, at least one of the connected nodes must be terminated (52.5). The option has two built-in termination circuits
which are activated by the terminator switches S300 and S301.
If termination is provided elsewhere in the network, the termination switches should be OFF. If a double-terminated bus topology is used, the first and
the last node should be double-terminated (105).
Termination switch positions are shown in the table below.
Termination type S 300 S 301
No termination (factory setting) OFF OFF
Double termination (105 )ONOFF
Single termination (52.5 ) ON ON
4 How to install VLT® FC 100 LonWorks
12
MG.11.E2.02 - VLT
®
is a registered Danfoss trademark
4
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 65 66

Comments to this Manuals

No comments