Danfoss TripleLynx CN Installation Manual Page 182

  • Download
  • Add to my manuals
  • Print
  • Page
    / 268
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 181
Configuration at a PC
Feed-in management for Solar-Log1000 PM+ (Extended/Power Management)
182 of 268 Solar-Log
1000/500/200
Installation
Section on code selection
The default setting is that messages are sent for all fault codes. You can use
this section to send messages more selectively. This will prevent SMS mes-
sages being sent for relatively minor faults.
1 On the List of all status codes and List of all error codes, select the de-
sired groups and set the number of faults (Activate after x measurements)
after which a message is to be sent.
Even the Max. number per day can be specified for the messages to be
sent.
2 Click on Save
8.16 Feed-in management for Solar-Log
1000
PM+ (Extended/Power
Management)
In Germany, photovoltaic systems with capacities over 100 kWp must have
the option of having this reduced by the network operator in the effective feed-
in power.
This dialogue box is used to configure the power reduction (feed-in manage-
ment) in Solar-Log
1000
PM+.

Note
The feed-in management function is not available for all supported inverters.
You can find more information at www.solar-log.com.
Opening the dialogue box
On the navigation bar on the left, select Extended/Power Management
The following dialogue box appears on the right:
Page view 181
1 2 ... 177 178 179 180 181 182 183 184 185 186 187 ... 267 268

Comments to this Manuals

No comments