Danfoss TripleLynx CN Installation Manual Page 49

  • Download
  • Add to my manuals
  • Print
  • Page
    / 268
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 48
Connecting the inverters
REFUSOL
Solar-Log
1000/500/200
Installation 49 of 268
4.17 REFUSOL
Overview
Interface integrated
Where to connect: RS485 socket on the bottom of the inverter
2 pin wiring
Communication address must be allocated.
Work steps
Switch off the inverters and the SolarLog™; Page 17
Connect inverters to the Solar-Log
Connect the inverters to each other
Allocate communication address
Instructions for older Solar-Log™/Refusol installations
Set compatibility: Page 51
Connecting inverters to the Solar-Log
The wiring is done using the
self-made, shielded 2 wire data cable and terminal block connector
( Page 15).
Procedure
1 Connect wires as shown in the diagram below:
Solar-Log™ terminal block connector
R485 inverter socket
Terminal
Pin
1
2
4
3
2 If only one inverter is to be connected it must be terminated:
On the sockets RS485 OUT with REFUSOL round plugs bypass the con-
nections PIN1 to PIN2 and PIN3 to PIN4.
3 Close the inverter if no other inverters are to be connected.
4 Insert the terminal block connector into the Solar-Log™ RS485 socket.
Page view 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 267 268

Comments to this Manuals

No comments