Danfoss TripleLynx CN Installation Manual Page 107

  • Download
  • Add to my manuals
  • Print
  • Page
    / 268
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 106
Connecting the inverters
EKO Energy
Solar-Log
1000/500/200
Installation 107 of 268
4.50 EKO Energy
Overview
Interface integrated
Where to connect: Between the COM round sockets on the outside of
the inverter.
2 pin wiring
Communication address must be allocated.
Work steps
Switch off the inverters and the SolarLog™; Page 17
Connect inverters to the Solar-Log
Connect the inverters to each other
Allocate communication address
Connecting inverters to the Solar-Log
The wiring is done using the
ready-made data cable (supplied with the inverter).
or
a shielded, 2 wire data cable made by yourself and a terminal block
connector ( Page 15).
Procedure
1 If you are fabricating the cable yourself, connect the wires as shown in the
following diagram:
Solar-Log™ terminal block connector
Inverter round socket
Terminal
Pin
1
1
4
2
2 Insert the round plug into any COM round socket on the inverter.
3 If only one inverter is to be connected terminate this in accordance with the
inverter instructions.
4 Insert the terminal block connector into the Solar-Log™ RS485 socket.
Connecting the inverters to each other (Solar-Log
500
, Solar-Log
1000
)
Connection using your own fabricated daisy chain cable.
Where to connect: Between the COM round sockets on the outside of
the inverter.
Page view 106
1 2 ... 102 103 104 105 106 107 108 109 110 111 112 ... 267 268

Comments to this Manuals

No comments