Connecting the inverters
Schüco SGI series (RS485)
Solar-Log
1000/500/200
Installation 47 of 268
Procedure
1 Insert the plug into the X6 socket on inverter 1.
2 Insert the other end of the wire into the X7 socket on inverter 2.
3 Connect the other inverters to each other in the same way.
4 Terminate in the last inverter in accordance with the manufacturer's handbook.
Allocating communication address
Setting: Via the inverter's operating display in the Communication
menu; parameter 89
Recommendation: Consecutive numbering starting with 1.
Set this in the SSP address menu item.
In the same menu set the COM port to Protocol 1 - Solutronic (parame-
ter 265).
Procedure: As set out in the inverter's instructions
4.16 Schüco SGI series (RS485)
Overview
Interface integrated
Where to connect: RJ45 socket on the bottom of the inverter
2 pin wiring
Communication address must be allocated.
Work steps
• Switch off the inverters and the SolarLog™; Page 17
• Connect inverters to the Solar-Log™
• Connect the inverters to each other
• Allocate communication address
Connecting inverters to the Solar-Log™
The wiring is done using the
ready-made data cable (optional extra; not supplied)
or
your own fabricated cable connection with RJ45 plug and terminal
block connector ( Page 15)
CAUTION
Risk of damage to the unit!
The Solar-Log™ also has an RJ45 socket, which must never be connected to
the RJ45 socket on the inverter.
Only connect the inverter using the RS485/422 B interface of the
Solar-Log™ or on the Solar-Log
1000
also via the RS485 A interface.
Comments to this Manuals